I need a solution
I have a Windows 2008 server with BE 2012 installed.
The current date format of the server is mmddyyyy and customer would like to change it to ddmmyy.
Will this change impact the way jobs are configured in BE ? Do i need to make any changes after the settings are changed at the OS level .
Thanks in advance.