I need a solution
We're about to upgrade our 5230 appliances to 2.6.0.3 and I want to be sure our scheduled jobs don't start during the patch. What's the easiest way? All jobs are configured through SLP's.
Thanks
We're about to upgrade our 5230 appliances to 2.6.0.3 and I want to be sure our scheduled jobs don't start during the patch. What's the easiest way? All jobs are configured through SLP's.
Thanks